This bike came to us with a tired and underwhelming hub motor system on it. We removed the old kit and installed a BBS02 on it to give it some go! Required about 5 hours labor in total to remove the old kit, modify the frame and fit the new kit.
The old controller was under the “fuel tank” so pulled it all off and the tank is mainly cosmetic now.